Magic Software Americas
For the Plant Manager · Operations Manager · Plant Engineering Lead

You'll run this plant for the next ten years. It gets designed in the next ten weeks.

Layout, flow, buffer sizing, utility drops, where the data comes out — all of it gets locked before bids go out, usually in a room you're not in. Validate the design while it's still drawings. After the concrete, every fix is a change order.

What an Unvalidated Assumption Costs

The design is cheap to change. The building is not.

Every design decision made on an untested assumption is a risk that compounds quietly until construction makes it visible — and expensive. The window where it's still a drawing is short, and it's open right now.

$2M+

in design changes discovered during construction

The flow problem was in the drawing the whole time. You find it when the steel is up and the only remedy costs money you didn't budget.

6 months

of launch delay while competitors advance

A rework loop on the critical path doesn't just slow the build. It moves your launch, and the launch date is the one number everybody above you remembers.

Your name

on the project overrun

You inherited the design decision. You own the overrun, the ramp and the ten years of running whatever got built.

Two Ways to Get to Startup

Same budget. Same date. Very different first quarter of production.

The usual sequence

Design → bid → build → find out.

  • Design, bid, build, then hope the flow works.
  • Capacity is a number somebody asserted in a spreadsheet.
  • Problems surface during construction, when options are gone.
  • Change orders absorb the contingency, then the budget.
  • Startup becomes the first real test of the design.

With the design validated first

Design → validate → fix on paper → build.

  • Week one: the highest-risk assumptions are named and ranked.
  • Every critical flow is simulated before it is procured.
  • Capacity, buffers and constraints are tested, not asserted.
  • The fixes land in the drawings, where they cost drafting time.
  • You go to construction with a validated design, not a hope.

Nothing here replaces your design firm or your contractor. We test what they produced against how the plant actually has to run — which is the part nobody in the room is paid to question.

Plant & Process Design Validation

A scoped validation. Simulated flows. Named risks. A real package.

Not a design review meeting. Not a second opinion in a deck. We model the plant you're about to build, run your product mix through it, and tell you exactly where the design will bite.

01

72 hours

Find the assumptions that can hurt you.

A fast first pass over the design package to surface the highest-risk assumptions: the ones where being wrong is expensive and the drawings don't prove it either way. You get a ranked list in days, not a study in months.

02

Simulation

Test every critical flow virtually.

Material flow, line balance, buffer sizing, changeover, labor loading and the ramp sequence, modeled against your real product mix. We find the constraint on the screen so it isn't discovered on the floor.

03

Package

Hand the build team something buildable.

A construction-ready design package with the risks named, the fixes drawn, the cost impact quantified and the implementation sequence worked through. You walk into the bid conversation with validated numbers.

Your design validation includes

  • Critical risk identification, ranked by cost of being wrong
  • Process flow simulation on your real product mix
  • Compliance and code validation against the design
  • Construction-ready design package
  • Cost impact analysis for each recommended change
  • A no-surprise implementation plan with downtime windows
How It Runs

Three steps. The first one takes half an hour.

1

Book the design review

Thirty minutes on what you are building, what is already locked, and which decisions are still genuinely open. No deck.

2

Get the validation

We model the critical process flows, stress the assumptions, and come back with the risks ranked and the cost of each one quantified.

3

Build with confidence

The fixes go into the drawings. You go to bid with a validated design and an implementation plan operations has already agreed to.

The terms

If we can't identify at least three critical design risks, the validation costs you nothing.

Design validation is senior-team work, so we run a small number of these at a time — typically three engagements in a quarter. If the timing matters, say so on the call.

Proof

The point of validation is the mistake you never paid for.

“Axiom has been able to evaluate, understand and validate process designs that saved us from costly mistakes. I would highly recommend any manufacturer work with Axiom Manufacturing Systems for design validation.”

James Lawrence

Director of Operations, ECM Specialty Chemicals

Magic Consulting was formerly branded Axiom Manufacturing Systems; the quote is reproduced as given.

Who runs it

Operators and controls engineers, not a research team.

1,900+ automation projects and 30+ years of controls engineering sit behind the validation, across Ignition, Rockwell, AVEVA, Siemens, Omron, Mitsubishi, Schneider, FANUC, Yaskawa, Cognex and ABB. The people reviewing your drawings have commissioned lines that looked like them.

How Magic Consulting works
The Decision Everyone Defers

Design the data out of the plant while it's still a drawing.

The connectivity question always gets pushed to phase two. Then phase two arrives, the panels are closed, the network is flat, and getting a clean signal off a machine means a shutdown you can't schedule. Deciding where the data comes out is a drawing-stage decision that costs almost nothing now and a great deal later.

  • Where each machine exposes its data, and on what network segment.
  • Which signals you will actually need for OEE, downtime and yield on day one.
  • How the plant hands data to ERP, MES and quality without a rewrite later.
  • What the historian and the panels have to be able to do in year three.

Read next

Connect what you already own.

The same argument, one layer up: twelve systems that don't agree, and what it takes to make them agree without replacing any of them. If your new plant has to live alongside the two you already run, start there.

Connect What You Already Own

Building for a floor you can actually see? The visibility page covers what it takes to get OEE, cycle time and downtime from what the machines actually did.

See What's Actually Happening on the Floor
Frequently Asked

What plant managers ask before the design review.

We already have an engineering firm. Does this step on them?+

No. They produce the design; we test it against how the plant has to run. We read what you already paid for rather than redoing it, and we bring the design firm into the findings review. The output is a better version of their package, not a competing one.

How late is too late?+

The best time is before bids go out, while changes cost drafting hours. It is still worth doing after award and before long-lead procurement, because equipment selection and buffer sizing are usually still movable. Once the concrete is poured and the steel is up, we are into change-order territory and the conversation changes.

Is this only for greenfield plants?+

No. Most of the work is expansions, line additions, and relocations into an existing building — where the hard part is the interaction with what is already running. We validate the new design against the plant you have, not an empty box.

What do you need from us to start?+

The current design package, your product mix and volumes, and an hour each with the people who will run the line. If simulation data exists from the design firm we start from it. If it does not, we build the model from your production history.

Will this slow the project down?+

The first pass is measured in days, and it runs in parallel with work that is already happening. The schedule risk you should worry about is the rework loop during construction, which is measured in months.

Do you recommend equipment and vendors?+

We will tell you what the design needs and what we think of the options, and that recommendation is not tied to anyone's product line — including ours. Magic Consulting recommends the right tool, not necessarily a Magic tool. That independence is the whole reason the recommendation is worth anything.

Fix it in the drawing. Not in the concrete.

Tell us what you're building and which decisions are still open. We'll tell you on the call whether a validation is worth your money at this stage — and if it isn't, we'll say that too.